The 4th Aromatics Plants, Process Area 

   Earthwork: 394,000 cubic meters.
■   Total Concrete: 77,000 cubic meters.

■   Industrial Building: 12,000 square meters.

■   Steel Structure: 6,750 tonnes.
■   Total Piping: 1,110,000 (inch-dia). 

■   Super heavy Equipment: 6,800 tonnes.

■   Fixed, Rotary, Fire Heaters: 23,000 tonnes.

■   Insulation Work: 160,000 square meters.

■   Electrical Cabling: 636 km.
■   Instrument Cabling: 513 km.
■   Painting: 346,000 square meters.